RATech is integrated with asphalt plant by adding aggregate, bitumen and anti-aging into RAP material for bitumen base production.
Brand new innovation project designed for E-MAK mining facility which can provide aggregate for asphalt plant, concrete plant, cold mix plant 24/7 simultaneously. It is an aggregate preparation-stocking -dosing system which includes re-crushing system. It is also environmentally friendly and energy saving system.
In addition to features of CHALLENGER, it diminishes significant amount of moisture from wet aggregate. Thanks to Aggregate Modification Plant, aggregates purchased from third parties but not suitable for production recipe is modified through re-crushing and sieving. As a result, the unsuitable aggregate is now modified to be used in asphalt plants, moisture content is minimized which leads asphalt plants to work in full capacity and efficiently.
E-MAK asphalt plants are produced under EU directives; Machine Safety Directive 2006/42/EC, Electromagnetic Compatibility 2004/108/EC and Low Voltage Directive 2006/95/EEC and in line with EN standards with its CE marking. Also; E-MAK proudly holds EAC- Eurasia Certificate of Conformity, ISO 9001 Quality Management Certificate and ISO 14001 Environmental Management System Certificates.